Well, the day arrived at last. Al came over and helped me finish off the riveting - fitting the last of the rib patches and tightening some old ones under the stern. Once that was done we were able to fit the frame I built a year ago, and start winching. The stress came when we reached the halfway point and I had to hold the hull upright - on a very windy day - while the chain block was rigged around the other side. The whole routine took just over an hour. Now ready for phase two....
Sunday, September 19, 2010
Roll, roll, roll your boat....
Well, the day arrived at last. Al came over and helped me finish off the riveting - fitting the last of the rib patches and tightening some old ones under the stern. Once that was done we were able to fit the frame I built a year ago, and start winching. The stress came when we reached the halfway point and I had to hold the hull upright - on a very windy day - while the chain block was rigged around the other side. The whole routine took just over an hour. Now ready for phase two....
Sunday, September 12, 2010
Frustration....
| The last floor - promise! |
| Keel bolts ready to install - 28/8 |
Tuesday, August 24, 2010
Transformation
Saturday, August 21, 2010
| Wedge of mahogany will support the forward end of the floorboard. |
A wee update: Have been working on the engine beds and various other details. The beds are taking shape and are at the finishing stage. The stbd one is being test fitted below. The square of plywood bolted to the prop shaft was my primitive means of marking the shaft angle onto the beds. Made up the wedge that supports the for'ard end of the floorboards - a simple little item but like many things in boats not as simple as it at first appears....some to-ing and fro-ing with straight edges and dividers was needed to get it right. Tonight filled the holes left by Peter Murton's floors and engine bed bolts with timber.
I have also accidentally found a guy who can adapt the gearbox input shaft to the 100E - Victor at Transconverters said about $120, which is good enough for me, so I'll do some drawings and get the flywheel and shaft over to him on Monday. Also bought a heat exchanger off a BMC Commander for $40.00, this should be more than adequate, and some taps and dies so that I can fabricate my own keel bolts soon.
| Starboard engine bed trial fitting. |
Monday, August 16, 2010
Nearly there...
| Engine bed undersides. |
Spent the afternoon noodling away happily in the bilges. Made up the for'ard-most floor, that's ready to be sealed and fitted now. Then began working on the engine beds. Shaped both the undersides, tomorrow I'll double-check the shaft angle and the position of the gearbox mounts, then I'll be able to form the upper edges and drill bolt holes. Next major job - making and fitting keel and engine bed bolts.
Wednesday, August 11, 2010
Parson's Progress
Finished the cosmetic and mechanical renovation of the Parsons gearbox, spraying a final coat of machinery grey on Sunday (8th). As the "before" photo shows, this took some serious sanitising - waterblasting, paint stripping, scraping, elec. wire brushing, sanding, vinegar dipping, parts washing, more scraping, waterblasting, painting.... then new seals and bearings. But ready to be filled with fluid and mated to the 100E motor now.
| Before, and.... |
| ....well, hopefully it's obvious. |
Finished the cosmetic and mechanical renovation of the Parsons gearbox, spraying a final coat of machinery grey on Sunday (8th). As the "before" photo shows, this took some serious sanitising - waterblasting, paint stripping, scraping, elec. wire brushing, sanding, vinegar dipping, parts washing, more scraping, waterblasting, painting.... then new seals and bearings. But ready to be filled with fluid and mated to the 100E motor now.
Sunday, August 1, 2010
Progress
| Forward rib patch, showing the kind of 3-dimensional form required to follow the hull shape. |
Got up early this morning and went nuts with the primer and CEPS and, drilling holes in floors and so on. Dave showed up at 11 and we riveted in the four rib patches that were ready to go, then two of the floors. The little links I made to join the ribs over the keelson were glued and screwed in place.
The engine beds are rough-cut to length and propped in place to check the alignment of the new floors. When these are all fixed in place (next weekend?) I'll be able to remove the heavy-looking banana-style ones - yay - and start whittling away at the engine beds. Looking forward to that.
Subscribe to:
Posts (Atom)